Apply BASE ONE® to
Aggregate Base Used In:

New Construction

Reconstruction

Chip Seal Application

Full Depth Reclamation

Gravel Surface Treatment

How to apply BASE ONE®:

Full Depth Reclamation

1. Reclaim and inject BASE ONE® to designed depth in one pass.

First Pass Application

1. Reclaim to design depth on first pass.
2. Reclaim and inject BASE ONE® on second pass to designed stabilization depth.

 

Reclaim and Apply with Water Truck

1. Reclaim to design depth on first pass.
2. Scarify to minimize runoff.
3. Apply BASE ONE® to the surface with a water truck.
4. Reclaim on second pass to design stabilized depth.

   

Blade Mix Method

The blade mix method may be used after reclamation. It may also be used when adding base material during a new construction, reconstruction or regraveling project. Additional aggregate may be added prior to application.